Summary
Overview
Work History
Education
Skills
Timeline
Hi, I’m

Felipe Sardinha

P&G Manufacturing Director
Manaus,AM
"One of the biggest traps for smart engineers is optimizing something that shouldn't exist.”
Elon Musk
Felipe  Sardinha

Summary

Encouraging Manufacturing Director and problem-solver with talents for team building, leading and motivating, as well as excellent customer relations aptitude and relationship-building skills. Proficient in using independent decision-making skills and sound judgment to positively impact company success. Dedicated to applying training, monitoring and morale-building abilities to enhance employee engagement and boost performance.

Overview

18
years of professional experience

Work History

Procter & Gamble Co

Plant Manufacturing Director
07.2020 - Current

Job overview

  • GILLETTE & ORAL-B Brazil Strategic Business Development
  • Manaus Capacity Expansion Program – 2nd Site Ramp-up 2020100 FTEs (900 P&Gs / 200 Contractors) – Reduction of 19% FTEs vs P3Y with 5%
  • Site Technical Mastery Development & Female Techs Capability Program
  • Sustainability Ambition Plan – NET ZERO by 2030
  • Product Supply Efficiency 8MM USD Cost Savings – P3Y & 7.8MM USD Plant Enabling Savings (RPM)
  • NET Structural Savings @ 6.8% FY21-22 (BR Inflation @ 12%)
  • Site Process Efficiency (OEE) @ 89.5% (+4.2% vs P3Y)news SKUs launched (GILLETTE new Portfolio LA/NA – Skin-guard / Fusion) Supply Chain Synchronization Inventory Reduction @ CWH (RPM + FP) Agility increase – Shipments to LA / South Cone
  • RPM – Resins Portfolio Simplification – PP / PS / PPE

Procter & Gamble Co

GILLETTE Operations - Global Inj Molding Director
01.2017 - 07.2020

Job overview

  • Mexico - Irapuato [Site Productivity Improvement] FTE Reduction 1.5MM USD (Molding Man/Machine ratio 1:8)
  • USA - Boston [Product Design & New Material Initiatives] - New Initiative Disposable Razors (Recycled Handles – PP PCR) @ 2.5 MM USD
  • Vietnam – Ho Chi Minh [Site Ramp-up] Injection Molding / MK Operations Start-up @ 92% Efficiency (3 months)
  • Brazil – Manaus [Sustainability Program Development]t Gillette Site – ZERO Plastics Waste (Regrind Project) 2.1 MM USD/year
  • Germany – Berlin [Benchmark Strategy & Capability Program] IWS Mfg 5.0 & Touchless Operations (Lights-off) – Molding @ 1:15
  • Poland – Lǿdz [Site Operational Stgy & Stds Development]
  • LEGO Benchmark - Flow 2 Work (Making/Assembly) – 1.5MM USD MOE People

Procter & Gamble Co

Senior Operation Manager
04.2012 - 12.2016

Job overview

  • Design & Schedule Training program for operational teams Manage Production Schedule and Supply Chain Deliverables Develop Quality Control Systems [PCS] Implementation of Lean Manufacturing Strategy
  • Amazonas Plant [Shave Care – Grooming - GILLETTE] – 0.5 yrs
  • Rio de Janeiro Plant [Hair Care & Oral Care – Crest+ Pantene] – 2 yr
  • Sao Paulo Plant [Health Care + Baby Care – Vick+ Pampers ] – 2 yr

Procter & Gamble Co

Industrial Manager
04.2009 - 03.2012

Job overview

  • Implement & Optimize Industrial processes Design & Test new products Implement Process Control Strategy [Control State]
  • Amazonas Plant [Shave Care – Grooming - GILLETTE] – 3 yrs
  • Managed Operational Organization of making operations in Injection Molding technologies [70-80 P&Gers]
  • Increased Site Reliability through IWS (Integrated Working System) in Autonomous and Progressive Maintenance
  • Site Leader of Industrial Breakdown Elimination System

Anheuser, InBev
Busch

Site Engineering Manager
04.2007 - 04.2009

Job overview

Planning and Coordination:

  • Plan and coordinate all engineering activities at site.
  • Develop work schedules and ensure that all tasks are completed on time.

Team Management

  • Supervise the working team, including junior engineers, technicians, and operators. Assign tasks and ensure that team members have the necessary resources to perform their work effectively.

Quality Assurance and Safety

  • Ensure that all work performed at site meets established quality standards.
  • Implement and enforce on-site safety procedures to ensure a safe working environment.

Problem Solving

  • Identify and resolve any issues or challenges that arise during project execution.
  • Work closely with other teams, such as design engineering and construction management, to effectively solve problems.

Honda – Brasil

Engineering Trainee
01.2006 - 01.2007

Job overview

Engineering Capital Projects

Site Maintenance Management

Education

Federal University of Campina, State University of Amazonas – AM
Campina Grande, PB

Master of Science from Industrial Robotics - Automation Systems
01.2012

Universidade Do Estado Do Amazonas
Amazonas

Bachelor of Science from Mechatronics Engineering
07.2007

Skills

  • Autonomous Maintenance – P&G North & Latin America Pillar Leader
  • Progressive Maintenance – Breakdown Elimination Process
  • Product & Design Innovation
  • GSUM Greenfield Start-up Management
  • E2E Supply Chain Synchronization – Value Stream Mapping Leader

Timeline

Plant Manufacturing Director

Procter & Gamble Co
07.2020 - Current

GILLETTE Operations - Global Inj Molding Director

Procter & Gamble Co
01.2017 - 07.2020

Senior Operation Manager

Procter & Gamble Co
04.2012 - 12.2016

Industrial Manager

Procter & Gamble Co
04.2009 - 03.2012

Site Engineering Manager

Anheuser, InBev
04.2007 - 04.2009

Engineering Trainee

Honda – Brasil
01.2006 - 01.2007

Federal University of Campina, State University of Amazonas – AM

Master of Science from Industrial Robotics - Automation Systems

Universidade Do Estado Do Amazonas

Bachelor of Science from Mechatronics Engineering
Felipe SardinhaP&G Manufacturing Director